Monday, September 29, 2008

September 29, 2008

Monday

Another week of work. Looked at the result from the previous LC-MS in LCQ and also from ASE. Run another 2 washings in ASE. Did another run in the LCQ. Have my group presentation at 10 AM since my boss is in Reno, Nevada. Groupmates gave suggestions. Went back to lab (6th floor) and wash my xerogels. ASE was done and another run (2 washings) was made. Absorbance of washing obtained. LCQ of filtered samples (TC in water). Talked with the other boss about initial results and then ran the LCQ one more time. Did washing on another batch of xerogels.

No comments: